Wednesday, January 28, 2009

'expectations'

this is so laughable to me........

1. I'm the engr of a new structure but the principal designer issued out the drawings without my checking or approval. Before that, I even have to ask when I can check the drawings but their lame answer indirectly implies I'm not expected to check........

2. The drafter who did the drawings doesn't check his/her work n expect the engr to check. See item 1 again.

from prior experience, the drafter can make fundamental mistakes such as absolute wrong reinforcement......... bo chap liao, I'm so ready for an arrowing game if something goes wrong with the structure.

3 comments:

faTTey coOCkie said...

sigh,.....
face it.
you're different from 'them'.
it's kiwi land & not sg.

Unknown said...

it's me not.
not fattey....

nzoink said...

ya right!! rrrrrrrrrr looks cute!!

anyway, FINALLY get to c the drawings after another round of asking..... mayb i shld totally bo chap!